Occupancy date for Core and Shell

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Edgar Arevalo  on 

Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established.  Should I just wait til we get the first tenant occupancy d

0

Ventilation Requirement for High Rise Residential

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Jay Murray  on 

Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment?

0

Existing building LEED BD+C og LEED O+M

LEED Rating System Selection
posted by  Piotr Podhajny  on 

I am trying to guide a client for LEED  certification. It is for a work-clothes factory with administration, showroom, storage facility etc.

0

Interior Partitions Option 2: Strategy F without movable partitions?

NC-v4 EQc6:Interior lighting
posted by  Cindy Quinn  on 

Has anyone had success earning Interior Lighting Option 2: Strategy F with a project that doesn't have movable partitions?  Our project was denied this strategy because we don't have movable p

1
Thu Jul 4, 2019, 1:26 am

Prerequisites Submitted under Campus

LEED Rating System Selection
posted by  Guillermo Hernandez Espinoza  on 

Hi everyone, I was wondering, since some of the prerequisites are Campus Eligible, does that means I don't have to submitted those prerequisites if earned for the LEED projects inside the campus ?

1