Forum quick links
Points for ACP and as Pilot credit
Pilot-Credits MRpc102:Legal Woodposted by Keith Robertson on
We have registered our Canadian project for the Legal wood Pilot ACP.
Fossil fuel alternatives for K-12 chemistry labs?
posted by Gwen Fuertes on
Hi, this is a somewhat niche/specific question - we are working on an all-electric school (middle and high school) that includes a chemistry lab.
Credit Form - 25% vegetated requirement (Form has Error)
NC-v4 SSc3:Open spaceposted by Amarpreet Sethi on
The LEED User Guide clearly states in Equation 2.
LEED Campus - Large Site Area
NC-v4 SSc3:Open spaceposted by Anastasia Huggins on
We are looking at submitting this for a LEED Campus submittal but have some questions about the calculations.
Waste audit
EBOM-v4.1 MRp3:Waste Performanceposted by Jorge Lopez de Obeso on
Hello everyone.
We have a hotel project that is inside a core and shell LEED Certified building.
New sustainability position open at Lake|Flato
posted by Heather Holdridge on
Please share this info with any contacts you have that you think would be a good candidate for our Design Performance Coordinator position -- Thanks!
V4.1 credit for v4 project NC-v4.1 SSc4 - Rainwater Management
NC-v4.1 SSc4:Rainwater Managementposted by Ryan Harrington on
If my project is v4 and choose to use the V4.1 path for rainwater management, does the new point scoring also take effect? Basically my project has a meet the 95th percentile under v4 but if I
SCL Summit Report Now Available
posted by Candace Pearson on
Hi all,
Our team has been working hard to wrap up this year's SCL Summit Report, and we're excited to announce that it is finally complete!
WE Outdoor water reduction
NC-v4.1 WEp1:Outdoor Water Use Reductionposted by Geneva Guerin on
Are potted plants and trees (in raised beds on outdoor covered terraces within the site boundary), counted as vegetated surfaces for this prerequisite?
Disturbed site
CS-v4 SSc3:Open spaceposted by Guillaume Rose on
Hello,
In the case of a rehabilitation project in the center of Paris, on a 100% mineral site, is this requirement applicable?