Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

No Cooling Tower - Baseline system categorization

NC-v4 WEc3:Cooling tower water use
posted by  Michelle Bombeck  on 

According to the Appendix G, our building does not fall into the allowable project type for System 7 or 8 but only because Appendix G indicates that the building has to be more than 5 stori

1
Mon Aug 10, 2020, 12:31 pm

Pilot credit worksheet comments

Pilot-Credits IPpc93:Prevention through Design
posted by  Evgeniya Barabasz-Lynn  on 

Our project is pursuing the pilot credit “Prevention through Design”.

Operation & Maintenance:

0

Roofing Materials

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Jason Cocek  on 

I have a project that, in addition to other upgrades, is replacing the roof. Do all of the roofing materials need to be included in calculations for MRc3?

6
Student Building Research Assistant
UC Davis FM Energy and Engineering
LEEDuser Basic Member
0 thumbs up
Mon Jul 27, 2020, 11:13 pm
1
Mon Jul 27, 2020, 9:52 pm
4
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Mon Jul 27, 2020, 7:43 pm

Project Boundaries - Different Certifications, Different Towers, But Common Retail Podium & Basement

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  ARDOR GREEN  on 

Given the number of questions already posed on project boundaries, I hesitate to post this, but I'm still stumped. 

1
Tue Jul 28, 2020, 6:14 pm

Calculation of Option 1 - Paths 1 or 2

NC-v4.1 LTc4:Surrounding Density and Diverse Uses
posted by  Brian Kish  on 

We have a renovation project in downtown Pittsburgh and trying to complete documents to achieve LEED v4.1 ID+C rating system.

1
Tue Jul 28, 2020, 12:39 pm

Biodigestion process instead of composting

ND-Plan-v4 GIBc16:Solid waste management
posted by  LEED Pro Consultant  on 

We are trying to achieve the GIB - Solid Waste Management.

 

1
Mon Jul 27, 2020, 3:53 pm

Tolerance within the achievement of the criteria due to different affectations

NC-v4 EQc7:Daylight
posted by  Audrey LEDESERT  on 

Hi,

I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces).

1
Mon Jul 27, 2020, 12:52 pm

Water-resistant flooring

Homes-v4 MRp2:Durability management
posted by  Alec Luong  on 

The credit states to "use water resistant flooring; do not use carpet." Is there a specific list of what LEED considers to be water resistant flooring?

1
Wed Jan 27, 2021, 6:24 am