Forum quick links
Documentation for No Cooling Tower
Pilot-Credits WEpc94:No Cooling Towerposted by Marelle Davey on
Hi everyone,
Just wondering what documentation have folks used to achieve this credit? Is any documentation required besides mechanical drawings?
Thanks!
Do we need to included tenant area in renewable energy calculation for CS building?
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Dear All,
Core and Shell selection - Question
posted by Konstantina Kalliakoudi on
Hello to all LEED users,
Has anyone used Grasshopper for energy simulation and successfully submitted for LEED certification?
CS-v4 EAp2:Minimum energy performanceposted by James Cai on
Warehouse ventilation filtration system
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Mena on
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced IAQ credit <<Interior Cross Contamination Prevention>>, this
Integrative Process Facilitator
posted by Edward Reifenstein on
The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u
Food Service Equipment
CI-v4 EAc5:Enhanced refrigerant managementposted by ESD Engineer on
For a LEEDv4 CI project, does food service equipment such as ice cube machines, ice machines, and chiller freezers need to be documented?
LEED O+M Campus Chiller Plant
EBOM-v4.1 EAp3:Energy Performanceposted by Rajarajan Sekar on
We are trying to go for LEED O+M certification in one of our buildings which has a Chiller plant in it along with other occupied places
Fully Unconditioned Cold Dark Shell Envelope Requirements
CS-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
Advanced energy metering required for LEED when exempted by energy code?
Healthcare-v4 EAc3:Advanced energy meteringposted by Mark Benson on
Our building is following ASHRAE 90.1-2016 for code compliance purposes. Under section 8.4.3 Electrical Energy Monitoring, there is an exception for "Critical and Equipment branches or N