Forum quick links
Controls for Open Plan Work Stations
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Ciaran McCabe on
In relation to the open plan offices. If we have an area where 6 people work served by one fan coil unit. The fan coil unit can be controlled via the BMS.
Green Roof and Certification
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Patrice McVeigh on
Hi All, I'm working on a core and shell project.
Core and Shell Certification
posted by Patrice McVeigh on
Hi All, I'm working on a core and shell project.
SSc4.2 Bicycle Storage for a mixed-use Hotel/Commercial Space
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Bhavin Pardiwala on
Hi, I'm currently working on a mixed-use Hotel and commercial space in Chicago. I was wondering if Hotel guests would be accounted for in determining number of bike racks or storage space.
Provide the source of data
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Matt Luedders on
Under the lead section, the credit language includes the requirement to "Upload lead documentation.
Building Flush - Filter Change?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Brianne Smith on
Our project is pursuing Option 1 Path 2 - Flush During Early Occupancy. Do filters need to be replaced after the flush, or only after construction as part of IEQc3.1?
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
Tenant Lease Agreement Details
posted by Patrice McVeigh on
Hi All, I am working on a Core and Shell project, we know who the tenant is and we are looking to draft a legally binding document to ensure that they will install a specific building system. My qu
CI - ID Credit for Cooling Tower Collection
CI-2009 IDc1:Innovation in Designposted by Rachel Manoguerra on
I'm working on a CI project where a 1000 gal storage tank will be set up for the collection of water from the cooling tower. We are not taking credit for it in our WEc1 Waste Water Credit.
VRF system
NC-2009 EAp3:Fundamental Refrigerant Managementposted by GISELA FARHAT DE ARAUJO on
We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?