Forum quick links
Energy Use from EAp2 / EAc1
NC-2009 EAc6:Green powerposted by Michele Helou on
We have already had our EAp2/EAc1 energy model credits reviewed and approved. In an effort to achieve a higher LEED rating, the owner has opted to purchase REC's.
FTE calculation using CS appendix 1 for NC project
posted by J.W. Shin on
I'm on the hotel NC project and we are under discussion that how to determine FTE number. If there is no certain number of FTE, can we use CS appendix 1 to determine FTE?
Flow rate for Kitchen Sink
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by ABHIJIT PISAL on
I just want to understand at what pressure is flow rate of kitchen sink (2.2 GPM) defined
Exemptions to ASHRAE 90.1 - 2010
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Fiorelli on
Hello all, We're working on a project that has an area that is includeded under exemptions to ASHRAE 90.1-2010 Interior Lighting Requirements.
New Construction
NC-2009 PIf1:Minimum Program Requirementsposted by Hugh Hagues on
I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"
Appendix G - Baseline Building Rotations
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi All, Are baseline building rotations necessary for a new building that is connected to an existing building. Note that the new building is being modeled as a stand alone.
Natural and mechanically ventilated space: hybrid LEED model
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jeremy Eddy on
> I am trying to model a hybrid system in Carrier HAP. We have a VRF system that utilizes dedicated outdoor air at a constant supply CFM as well as standard indoor recirculation units.
Call-a-Ride as compliant public transport
Schools-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Todd Bundren on
The local metro transit service (public transit services) in my project’s area offers a Call-A-Ride curb-to-curb service for the general public and persons with disabilities.
Clarification of credit intent and documentation
Pilot-Credits SSpc55:Bird collision deterrenceposted by Joseph Ford, AIA on
I am having difficulty determining if my project can comply with this credit.
Kitchen Faucet
CS-2009 WEp1:Water Use Reductionposted by ABHIJIT PISAL on
The building what we are certifying does not have kitchens or canteen. It only has pantry/breakout areas wherein people have snacks and beverages.