Forum quick links
PDF Template Question
CI-2009 MRc4:Recycled Contentposted by elizabeth warlop on
Hello, I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.
Building on parking spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Tanja Arnesson on
Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces.
Credit Calculations
Pilot-Credits PC19:Whole Building Reuseposted by Christine Robbins-Elrod on
Hi, I'd like to verify if I have documented this Pilot Credit correctly? -I have included exterior windows in the building envelope calculations since the team is preserving all existing windows (b
LEED Project boundary and EAp2, EAc1
NC-2009 EAp2:Minimum Energy Performanceposted by Kim Sosalla-Bahr on
The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building.
Points for Provision of "Sun Pipes" Under innovation
NC-2009 IDc1:Innovation in Designposted by Yong Lee Low on
I am working on a factory project at Jakarta, Indonesia. They are using Sun Pipes to illuminate the work spaces in the office area(at level 2).
Would a Warehouse need to have Occupancy Sensors?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Augusto Velazquez on
Our project includes an office area and a warehouse area. The office area will have occupancy sensors for each office, bathroom, corridors, etc. The warehouse will not have sensors.
Count LED conversion for EBOM MRc4?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Molly ODONNELL on
Can MRc4 be used on EBOM project purchasing LED troffers instead of any CFLs? (Building is in the process of converting all fixtures to LED, thereby eliminating the mercury.)
Occupancy for Physical Therapy Rooms for LEED for Schools
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by Dana Murdoch on
I'm working on an early childhood education center that has a tenant that provides occupational and physical therapy to children on a one-hour appointment basis.
Window STC vs. OITC
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Dana Murdoch on
If our windows have an STC of 35 but an OITC of 25 would they qualify? I don't think so, but I don't know how to interpret or relate the OITC to STC.
Indoor Carpet Adhesives
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Colleen Ice on
Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives.