Forum quick links
Material Description vs Material Type in the Calculator
NC-v4 MRc5:Construction and demolition waste managementposted by Agnieszka Rylska on
There are two separate columns in New Construction and Demolition Waste Management Calculator in .xls format: ‘Material Description’ and ‘Material Type’.
Maintenance Garage Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Keith Lane on
I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.
single occupant offices as designated smoking rooms?
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Christian Bösselmann on
In a multi tenant CS office building smoking is prohibited in the entire building (Option 1). However the owner wishes to execute a few single person offices as designated smoking rooms.
Charging Station Location
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by on
This project is a small Inn that has a small parking lot onsite and a larger parking lot outside of the project boundary.
CI V4- Innovation: Green Vehicles
CI-v4 INc1:Innovationposted by Oliver Bate on
My project has 30% of carparking reserved for electric vehicles. The plugs used comply with an IEC standard but not the one specfied in the credit requirements.
Information on 10 years canopy
CS-v4 SSc5:Heat island reductionposted by Marianne Vajstedt on
Do you know where information can be found to determine the daimeter of trees after 10 years of planting? Our landscaping architect have only the information in maturity.
Baseline LPD for a Vehicle Driving Test ground
NC-2009 EAp2:Minimum Energy Performanceposted by Aru Sau on
There is Car Driving Test Ground located outside the building, which takes power from the substation inside the building. This ground is closely resemblance of a space like car racing (i.e.
Project has shuttle to train station
NC-v4 LTc5:Access to quality transitposted by Lou Niles II on
The train station is just about 1mile from the projectHello I have a project in California with multiple shuttles that run short routes in the area of this NC building.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Casey Krieg on
Beginning to document the EDP's and such for this credit and in the resources tab under the credit I found the BPDO Calculator, which is an excel spreadsheet tool to help document and organize your
Manufacturer Take Back Programs
NC-v4 MRc5:Construction and demolition waste managementposted by Leanne Conrad on
I am looking for information on what type of backup documentation is required when we choose to use a manufacturer take back program as part of our recycling program.