Material Description vs Material Type in the Calculator

NC-v4 MRc5:Construction and demolition waste management
posted by  Agnieszka Rylska  on 

There are two separate columns in New Construction and Demolition Waste Management Calculator in .xls format: ‘Material Description’ and ‘Material Type’.

1
Thu Oct 26, 2017, 2:28 pm

Maintenance Garage Baseline System

NC-2009 EAp2:Minimum Energy Performance
posted by  Keith Lane  on 

I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.

3
Default Avatar
Project Engineer
GGD Consulting Engineers
LEEDuser Basic Member
0 thumbs up
Thu Oct 5, 2017, 2:55 pm

single occupant offices as designated smoking rooms?

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Christian Bösselmann  on 

In a multi tenant CS office building smoking is prohibited in the entire building (Option 1). However the owner wishes to execute a few single person offices as designated smoking rooms.

3
Senior Energy & Sustainability Consultant
a°blue / atmosgrad GmbH
LEEDuser Basic Member
3 thumbs up
Thu Oct 5, 2017, 12:07 am

Charging Station Location

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by     on 

This project is a small Inn that has a small parking lot onsite and a larger parking lot outside of the project boundary.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Oct 4, 2017, 8:02 pm

CI V4- Innovation: Green Vehicles

CI-v4 INc1:Innovation
posted by  Oliver Bate  on 

My project has 30% of carparking reserved for electric vehicles. The plugs used comply with an IEC standard but not the one specfied in the credit requirements.

0

Information on 10 years canopy

CS-v4 SSc5:Heat island reduction
posted by  Marianne Vajstedt  on 

Do you know where information can be found to determine the daimeter of trees after 10 years of planting? Our landscaping architect have only the information in maturity.

1
Mon Oct 9, 2017, 1:52 pm

Baseline LPD for a Vehicle Driving Test ground

NC-2009 EAp2:Minimum Energy Performance
posted by  Aru Sau  on 

There is Car Driving Test Ground located outside the building, which takes power from the substation inside the building. This ground is closely resemblance of a space like car racing (i.e.

1
Thu Oct 5, 2017, 3:11 pm

Project has shuttle to train station

NC-v4 LTc5:Access to quality transit
posted by  Lou Niles II  on 

The train station is just about 1mile from the projectHello I have a project in California with multiple shuttles that run short routes in the area of this NC building.

1
Fri Nov 3, 2017, 7:24 pm

BPDO Calculator

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Casey Krieg  on 

Beginning to document the EDP's and such for this credit and in the resources tab under the credit I found the BPDO Calculator, which is an excel spreadsheet tool to help document and organize your

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Oct 3, 2017, 9:04 pm

Manufacturer Take Back Programs

NC-v4 MRc5:Construction and demolition waste management
posted by  Leanne Conrad  on 

I am looking for information on what type of backup documentation is required when we choose to use a manufacturer take back program as part of our recycling program.

3
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Oct 31, 2016, 4:09 pm