Baseline for unconditioned building
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
we have a dormitory building with mechanical ventilation (treated with cooling to reach 20 C and a CAV reheat terminal ) only associated with ceiling fans, shall we model the baseline with no
Calculator Protected sheet v4 1_Bldg products calculator_v04
NC-v4.1 MRc2:Environmental Product Declarationsposted by Allison Para on
Hello LEED Experts,
Please help me with the v4.1 Calculator for (MR) Building products calculator. I am unable to make any changes or edits.
Sub-Metering for small service buildings
NC-v4 EAc3:Advanced energy meteringposted by Cyle Sheppard on
I have a question from our Electrical Engineer that I am unsure on.
Composite Wood - CARB Phase II
NC-v4 EQc2:Low-emitting materialsposted by Brad Newkirk on
Does plywood that meets CARB Phase II requirements for formaldehyde emissions automatically meet the requirements of this credit for Composite Wood?
Polished Concrete Floors vs. High SCM Slabs
posted by Max Driscoll on
On a large sports project, we worked with the structural engineer to spec low carbon / high SCM concrete mixes.
Terrazzo?
CS-v4.1 EQc2:Low-Emitting Materialsposted by Maria Porter on
I was under the impression that terrazzo could be counted as inherently non-emitting, but just received a review comment that it was not. I think I based it on the wording in v2009.
Option 2 (prescriptive path) documentation?
NC-v4 EAp2:Minimum energy performanceposted by Erica Downs on
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems
LEED MR Credits and Division 13
posted by Ralph Bicknese on
We are working on a LEED B+C (non healthcare) project that has a clean room and trying to determine whether or not the clean room "unit"/prefab wall panel systems and ceiling panel systems should b
Call for interest: Resilient Outcomes Working Group
posted by Bryna Dunn on
The Resilient Outcomes Working Group grew from a session at the 2020 Winter Summit in Gulf Shores AL, and we are still going strong. We are currently focused on three primary objectives: 1) b
IPpc90 Social Equity within the Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Alison Kerr on
IPpc90 in LEED Online, v4, BD+C, NCMR is "Social equity within the project team." Not "...the operations and maintenance staff." My comment is regarding the Project Team Pilot credit.