Forum quick links
Sensor Faucets
NC-v4 WEp2:Indoor water use reductionposted by Jennifer Rennick on
In prior versions of LEED, sensor faucets were given a credit for reducing hand washing duration from 15 seconds to 12 seconds.
ASE criteria fulfilled with automated dynamic façade
NC-v4 EQc7:Daylightposted by Ricardo Sá on
Hi,
Reuse of rainwater for irrigation
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Aneta Firląg on
Hello, on our project the runoff from roof area is directed to one concrete reservoir tank. Water is stored in rainwater cistern and reused for irrigation.
Office/Industrial Mix - AEDG for Small to Medium Office Buildings
CI-v4 EAc2:Optimize energy performanceposted by Martin Meehan on
Hello
I am working a building which is part office (30% of building area) and light industrial (70% of building area).
The overall area is approx 3000 m2.
Anica featured on AIA.org!
posted by Nadav Malin on
Love the profile of Anica as the "featured member" on AIA's website--congratulations, Anica!
End use with multiple fuels
Retail-CI-v4 EAc3:Advanced energy meteringposted by Jared Silliker on
I'm working on a grocery project. Cooking will be a significant energy load, exceeding 10%, and will be gas-dominant.
Server Virtualization Documenation
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Annie Levan on
Hello, I have a client that will be using server virtualization for their new data center but does not wish to share the server product information.
What is the base building service water?
CI-v4 EAc3:Advanced energy meteringposted by JASON NIEN on
In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to base building service water, thanks advance.
water consumption calculations for Irrigation
CS-2009 WEc1:Water Efficient Landscapingposted by Selvarasu M on
Hi,
The following are the queries with respect to irrigation calculations:
Campus submission for review
posted by Philippa Cameron on
Hi. We have a campus Master Site that we believe is ready for design review submission. We have completed all forms for the targeted credits and added all documents to LEED online.