Forum quick links
Policy, "Measurement and Records"
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Dennis Palmer on
The example provided for each policy specifically states measured values, for example Durable Goods Procurement measured value is within a given year at least 40% of the purchase shall be energy st
Appropriate Fenestration U-value for Baseline Model
NC-2009 EAp2:Minimum Energy Performanceposted by PATRICK CORRIGAN on
I can not tell, from either ASHRAE 90.1-2007 or from the LEED User's Manual, what U-value I am supposed to use for the baseline vertical glazing.
Recycled Steel content
NC-2009 MRc4:Recycled Contentposted by Katie Ellsworth on
We have several steel items that have been purchased for our contractors project. Most of the items show a total recycled content, then a post- and pre-consumer recycled content.
Multi-family residential - ASHRAE 62.1 2007 - ch. 5 Natural Vent
NC-2009 IEQp1:Minimum IAQ Performanceposted by Michele Helou on
We have a mixed use retail - residential project with the residential units relying on natural ventilation with the required 4% operable window area to floor area ratio.
LEED Certification for Phase wise construction
NC-2009 MRc4:Recycled Contentposted by Ramesh Narayanan on
Dear Sir/Madam, I have few clarification of whether the old constructed portion material should be considered for all the materials credits. Project Details: The building has been developed by t