Forum quick links
Outdoor air monitoring in corridors with induced ventilation
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Ricardo Sá on
We are currently working in a project where outdoor air requirements in corridors are met by means of induced ventilation (exhaust fans in contiguous WC's induce make-up air in the corridors).
LEED ND Plan Scope
ND-Plan-v4 MPR2:Must use reasonable LEED boundariesposted by Eduardo Straub on
In a future leed ND plan project, that comprises, besides all of the community needs and infrastructure, an enclosed condominium of houses, is it possible to include in the LEED Certification this
Updates Differences Between 90.1-2007 and 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by John Krutko on
Does anyone have a link to a concise list of the differences between 90.1-2007 and 90.1-2010?
Basecase Building Envelope
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Our project is G+3 factory building and it is a major renovation and we are renovated wall, window, HVAC equipment and we consider ASHRAE 90.1.2007 Building envelope for base case & renovated
Basecase Building Envelope
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we have two major renovated Building in India Building 01. No change in building envelope (used the existing wall, floor, window) but changes in whole MEP Design Building 02.
carpeting and flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Roger Lewis on
Is there a LEED standard for carpet properties or hard surface properties that affect the collection or resuspension of dust?
Outdoor air delivery monitor location?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mindaugas Mi on
Dear Leeduser.com members, who could explain where exactly should the outdoor air delivery monitor should be located? Only at the outdoor intakes?
Control devices required for meeting ASHRAE 55
CS-2009 IEQc7:Thermal Comfort—Designposted by Mindaugas Mi on
Dear Leeduser.com members. We have a question regarding whether we need these controls for meeting LEED credits under v2009 CS version. - Radiator heating system.
Reasonable Site Boundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by Mindaugas Mi on
Dear Leeduser.com members. I have a question regarding correct LEED boundary. 1.