EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  Michael Smithing  on 

The reference guide indicates that parking should be included in the hardscape area - this is good because much of the parking at our project uses an open grid paving system.

5
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Nov 20, 2013, 2:17 pm

Attached building

ND-v2009 GIBp1:Certified green building
posted by  Karyn Rodrigues  on 

Is it possible that an attached building (LEED certified) may be sufficient to meet the prerequisite GIBp1?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Nov 19, 2013, 10:56 pm

ENERGY STAR equipment in medical clinic finish-out

CI-2009 EAp2:Minimum Energy Performance
posted by  Christine Robbins-Elrod  on 

Our LEED-CI project is fitting within a shell space of a much larger LEED-NC hospital project (while the hospital also owns the clinic that is pursuing LEED-CI, GBCI has already confirmed that LEED

4
Tue Nov 19, 2013, 8:14 pm

Preferred Parking Requirements

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Dan Lokken  on 

On our campus we are using both LE/FE vehicle preferment as well as carpool preferment.

8
Tue Nov 19, 2013, 7:42 pm

Form IEQp3-8

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Misha Volf  on 

Hi All, I newbie question: when the credit asks me to upload Form IEQp3-8, is this a form that I download somewhere and fill out, or is it just a document (or several documents) that I create myse

6
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Nov 19, 2013, 5:06 pm

air testing in a mechanical room??

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

1) Do mechanical rooms need air quality testing? 2) There is an air handler unit that supplies air to multiple floors.

2
Mon Nov 18, 2013, 11:00 pm

Systems Manual - third party PV system

NC-2009 EAc3:Enhanced Commissioning
posted by  Lisa Logan  on 

Reviewer said that we need to include the PV for our project in the systems manual. The PV was exisitng (previously commissioned) and is owned, operated and maintained by a third party.

3
Default Avatar
Senior Sustainability Consultant
Noresco
LEEDuser Premium Member
0 thumbs up
Mon Nov 18, 2013, 5:53 pm

eQuest 3.65 model

CS-2009 EAp2:Minimum Energy Performance
posted by  František Bartoš  on 

Hello, I made model of quite simple rectangular office building in eQuest v3.65 and energy simulation run succcesssfully, but compliance analysis end with error code ""Error Assign zone to baselin

3
Mon Nov 18, 2013, 4:20 pm

Carpooling, Ridesharing?

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Maria Porter  on 

First question: In SSc3.3 for CI reserved parking spaces for car/vanpools are to be at least 5 % of FTE. In NC SSc4.4 parking spaces should be reserved for 5 % of number of parking spaces.

9
Green Mystic in Residence
LEEDuser Basic Member
75 thumbs up
Mon Nov 18, 2013, 11:33 am

Single zone VAV and 62MZ

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

Hi. I'm working with a building that has a VAV that supplies OA to a single room based on the numbers of people on that space.

4
Mon Nov 18, 2013, 6:07 am