Baseline HVAC DCV Sequence

NC-2009 EAp2:Minimum Energy Performance
posted by  Cory Duggin  on 

When the baseline system is required to have DCV, how should it be controlled. I'm not aware of any sections that details how the controls should work when it is implemented for the baseline.

1
Fri Dec 11, 2015, 3:39 pm

Materials and product certificaction topic

General forums
posted by  Alejandro LOPEZ  on 

Hi. If I have a material/product with an US LEED certificación, I could use it to submit it to the CaGBC LEED dossier? Thanks in advance, for the answer.

1
Wed Dec 30, 2015, 7:56 pm

HVAC system for 5 storey office block.

CS-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

I am modeling a core and shell building with 5 floors. This building will be served by two air handling units.

1
Mon Dec 7, 2015, 4:45 pm

Individual task lighting

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  ethan adams  on 

Are rechargeable battery-powered task lighting units acceptable for this credit?

1
Wed Dec 9, 2015, 6:13 pm

Humidification in system 7

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

The design model has an AHU that supplies air for some zones. During the winter season the AHU humidifies the air through an atomising humidifier.

1
Mon Dec 7, 2015, 4:54 pm

Glass Doors

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  John Covello  on 

Hello, Do Glass Doors count as windows and require automatic glare control?

1
Fri Dec 11, 2015, 12:51 pm

Document no materials and earn the credit

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  LEED Pro Consultant  on 

Hi, we are working in a Cold dark shell, therefore interiors and fit outs will not have any finish.

1
Tue Jan 12, 2016, 1:28 am

Landfill Site Certification

General forums
posted by  Marcelo Maciel de Santa Helena  on 

We've been approached by a landfill company to perform a consulting for LEED certification of new projects. The project for the site contains an administrative building and the landfill area per s

1
Wed Dec 30, 2015, 7:48 pm

PSI for faucets and showers

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Patrice McVeigh  on 

Hi, Can anyone please advise on the following; Do shower flow rates need to be calculated at 80 psi and installed at 80 psi? The same for for faucets, do flow rates need to be calculated at 60 p

1
Wed Dec 30, 2015, 9:20 pm

Tenant Neutral Option

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Miriam Ramirez Baumgarten  on 

Hi, Our project is following the Tenant Neutral option for WEp1c3 because even though the developer is providing all plumbing fixtures, preparations are available in case the upper floors (specul

0