Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Walk Off Mats in classrooms with exterior doors

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  TODD REED  on 

In the past we have just placed a typical walk off mat at the door in classrooms that have exterior doors. These are typical kindergarten classrooms that empty right onto the playground.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 23, 2018, 9:00 pm
3
Sustainable Design Specialist
FXCollaborative
LEEDuser Basic Member
0 thumbs up
Thu Aug 23, 2018, 7:25 pm

Emergency Generator

NC-2009 PIf2:Project Summary Details
posted by  Nicole Kimoto  on 

In our new facility we have an emergency generator that runs on diesel.

4
Thu Aug 23, 2018, 3:28 pm

Shaftliners in interior wall assemblies

NC-v4 EQc2:Low emitting materials
posted by  Vandita Mudgal  on 

Do Shaftliners in the interior wall assemblies fall under the Low-Emitting Material category for CDPH v1.1 2010 VOC Emission testing?

0

Complex Daily Occupancy - Daily Average Transients

NC-2009 PIf3:Occupant and Usage Data
posted by  Joe Malone  on 

We have a project with a complex occupancy. The facility is secure and staffed 24/7 by two groups, each group having 3 8-hour shifts.

3
Default Avatar
Mull & Weithman Architects
LEEDuser Basic Member
0 thumbs up
Wed Aug 22, 2018, 9:14 pm

Content access restrictions

BITuser
posted by  Andrea Lemon  on 

Currently, the BIT User site is fully accessible without having to log in (unless you want to edit or add content, of course).

1
Wed Aug 22, 2018, 9:44 pm

v4, IDC, LEED Interpretation ID# 10419, 2013 Title 24 Part 6 California Energy Code - Existing envelope?

CI-v4 EAp2:Minimum energy performance
posted by  Kevin Gilleran  on 

Hi,

Option 1 energy simulation - I am in review of the LEED Interpretation ID# 10419 and I am unclear how I model the existing envelope of a ID+C tenant space.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Aug 22, 2018, 5:29 pm