Forum quick links
Scorecards are needed?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Maki San Miguel Paulson on
1. When I registered for pilot credit 112 for LEED 2009 ID+C CI in February of 2017, there was no explicit credit documentation requirements that listed the need to obtain scorecards for each produ
Car Share on Campus - reserved for building occupants only?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Erica Downs on
I seem to remember a requirement somewhere for the Car Share option that for a campus setting, the vehicles must somehow be reserved for use by the LEED building occupants only.
Providing private buses
NC-v4 LTc5:Access to quality transitposted by Hanh Truong on
LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th
Incomplete spaces for solar panel and future process load
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.
Existing Envelop for Baseline case
Schools-NC-v4 EAp2:Minimum energy performanceposted by John on
I am modelling a school building where the new insulation is being added to the existing walls.
62MZ calculator in version 4 LEED
NC-v4 EQp1:Minimum indoor air quality performanceposted by robert feduik on
Has this calculator been changed for use in NC-v4 EQp1 versus the one used in LEED 2009? For new construction, are there any other prerequisites or credits that require the use of this tool in th
using construction rubble for mine rehabilitation
NC-2009 MRc2:Construction Waste Managementposted by Jutta Berns on
we have a project where the waste management contractor is proposing to use clean construction rubble (non-hazardous rubble, where all recyclable components, eg steel, and hazardous materials have
Multiple AHU's serving one zone
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lavanya Veerappa on
Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.
Installation of Lighting Posts
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Claire Bannister on
We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?
Energy Model for Ice Rink
NC-v4 EAp2:Minimum energy performanceposted by Shenhao Li on
Hello, We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption.