Restrooms removed from scope of work

CI-2009 WEp1:Water use reduction
posted by  Laurie Hughet-Hiller  on 

I've read all the comments here, but I'm still at a loss. I have a 3-building campus project in which one building is LEED CI and the others are LEED NC.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu May 26, 2011, 9:01 pm

Using Appendix A of ASHRAE 62.1-2007

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Karen Stewart  on 

Has anyone ever used the alternative compliance option for this prerequisite by following Appendix A of ASHRAE 62.1-2007?

4
President
REAL Building Consultants
LEEDuser Premium Member
27 thumbs up
Thu May 26, 2011, 7:36 pm

Automobile Service Garage

NC-2009 IEQc6.2:Controllability of systems - thermal comfort
posted by  Erin Adkins  on 

In an automobile service garage with 25 "stations" (there are not 25 employees, but worst case, I am assuming LEED will require each lift to be considered a "workstation").

2
Thu May 26, 2011, 6:19 pm

Parking Garage ventilation

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Robert English  on 

I am designing the truck bays at a fire station. The arrangement most closely resembles a parking garage.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Thu May 26, 2011, 5:58 pm

Pre K and K school question

Schools-2009 IEQp3:Minimum acoustical performance
posted by  Sara Sweeney  on 

I had perviously contacted GBCI regarding which rating system to use for this project, back in Summer 2010, which is a small Early Childhood Learning Center for 4 and 5 year olds and was told to us

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Thu May 26, 2011, 3:22 pm

Storage Rooms as Critical Zone using 62MZ Spreadsheet

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  James Keohane  on 

I have received review comments from a LEED Review Team questioning the results of the 62MZ spreadsheet which identified a Storage Room as the "Critical Zone".

2
Default Avatar
Mechanical Engineer, PE, LEED AP BD&C
HHB Engineers, P.C., Prattville, AL
LEEDuser Basic Member
63 thumbs up
Thu May 26, 2011, 1:30 pm
3
Thu May 26, 2011, 11:38 am

VOC Testing

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Maya Karkour  on 

Hello, Do you guys know if the VOC testing could be done by the paint manufacturer or should it be undertaken by a third party ? Should the testing be done in accordance to a special standard ?

3
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Wed May 25, 2011, 11:19 pm

100% of energy generated by PVs at site--will it earn 19 points?

NC-2009 EAc1:Optimize energy performance
posted by  Brooks Critchfield  on 

We have a project on a "campus" site with existing buildings. The Owner has installed an extensive array of PVs which are shared by buildings on this site.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed May 25, 2011, 4:03 pm

questions of Install Drift Eliminators and minimum efficiencies

Pilot-Credits WEpc17:Cooling tower water use
posted by  Jie Zhang  on 

In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system'.

2
Wed May 25, 2011, 3:57 pm