NC-v4 WEp2:Indoor water use reductionposted by Rick Ellison on
Reference Guide indicates WaterSense label requirements are mandatory in U.S. Right now the program for the WaterSense label on toilet flushometers is still in draft stage.
Help w/ wrangling RECs.
CS-2009 EAc2:On-site Renewable Energyposted by Brian Salazar on
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site renewable energy. The energy is fed directly into the building and used by the building.
Questions about High-rise residential LEED Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Tommy Xing on
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.
Compliant area
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.
HVAC system wasn't running during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Juanita Garcia on
If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? We have dated checklists documenting that the HVAC system wasn't running and that
Exterior Shading Devices
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall.
Partially Occupied Warehouse
NC-2009 IEQp1:Minimum IAQ Performanceposted by Annalise Reichert on
I am working on a project that has a 45,000 SF unconditioned warehouse and utilizes natural ventilation.
G3.1.1 Exception a
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I have a convention center project where it has a exhibit hall with high process load. It is larger than 20k ft2.
Reserved parking on existingcampus parking area outside building
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by LEEDme Lorenzi on
We have a new office project inside a campus, there is an existing big parking area serving the campus not adiacent to the building, no parking are allocated inside our LEED boundary and not new pa
Stormwater inspection
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Charalampos Giannikopoulos on
Both uploads SSc6-3 and SSc6-4 require the provision of “a copy of the most recent stormwater inspection and a log showing that any needed maintenance or repairs were performed within 60 days of th