Modeling Office Space in an Existing High Rise Building
CI-v4 EAp2:Minimum energy performanceposted by Annie Argento on
We're using eQuest to model a tenant improvement office space, which is about half of one story in a 28 story high rise office building in LA.
Dedicated bike lanes
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Phillip Henning on
What is a dedicated bike lane? I have a sidewalk leading to a new elementary school in two different directions. One is approximately 100 feet long from the from the primary access road.
overall accuracy, anticipated areas of error susceptibility
NC-2009 EAc5:Measurement and Verificationposted by Leanne Niu on
There is a review comment in my project as follows: It appears that the M&V plan provided does not specify the expected overall accuracy, anticipated areas of error susceptibility, and magnitud
New materials and resources calculator since 12/01/16
NC-2009 MRc5:Regional Materialsposted by Guillermo Brunzini on
Hello Everybody, Two questions: 1- a project registered in 2012 can use the new materials and resources calculator? 2- What happens with the cutsheets required in previous versions,?
Potential crossover credit from New Construction to Schools?
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greengrade User on
Our school is being rated under LEED for schools v2009.
Local voluntary cleanup program - definition
NC-2009 SSc3:Brownfield Redevelopmentposted by Anna Korinkova on
Under Option 1 of the credit, we can pursue EITHER the ASTM E1903-97 Phase II Environmental Site Assessment OR the 'local voluntary cleanup program'.
Well for condos !
posted by H Agarwal on
As the everything starts from top and gradually bottoms down. I wish Well for individual homes could be available .
Which flooring system in project scope must be compliant?
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alessio Zampaglione on
Hi everyone, I’m working on an office building project registered under LEED C&S2009 in which there are different flooring systems: .
Section 3.10 compliance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Edgar Arevalo on
I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.
Interior paint's VOC
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Magda Aghababyan on
According to Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993 the VOC limit for interior flat paint is 50 grams/liter of product minus water.