Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Flush Out for "During Occupancy" Case of a Major Renovation proj

NC-v4 EQc4:Indoor air quality assessment
posted by  Shabari Shaily Gerber  on 

Our project is an office building undergoing major renovation. The building will remain operational while the renovation is ongoing.

4
Tue Apr 24, 2018, 9:14 am

Losses through tank in HW loop

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

ASHRAE 90.1 states:

G3.1.3.6 Piping Losses losses shall not be modeled in either the proposed or baseline
building designs for hot water, chilled water, or steam piping.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 24, 2018, 5:42 am
3
Default Avatar
Green Lab
LEEDuser Basic Member
6 thumbs up
Mon Apr 23, 2018, 3:40 pm

Pneumatic Controls - Monitoring Based Cx

CI-v4 EAc1:Enhanced commissioning
posted by  Christopher Lim  on 

I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.

0

About Spray adhesives, Material has voc g/l limit and Greenguard certificate.

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Eunjoo Park  on 

My project is located in South Korea, so I open fall into difficulties to interpret manufacture data. 

0

Spray adhesives has VOC Contents and GREENGURAD certificate also. This material can be use?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Eunjoo Park  on 

My project located in South Korea. So I often fall into difficulties to interpretation manufacture data.

The material is "Scotch-WeldTM Hi-Strength Postforming 94 CA".

0

one product both meet two criteria in option2.

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Renaud Gay  on 

Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.

8
Sun Apr 22, 2018, 7:09 pm

Multi-occupant spaces required?

Retail-CI-v4 EQc6:Interior lighting
posted by  Jared Silliker  on 

I find the reference guide confusing on this credit. Am I reading it correctly that multi-occupant spaces do NOT need to be addressed for lighting controls within v4 Retail projects?

0

Kudos to this year's COTE Top Ten Winners!

Green Commons
posted by  Nadav Malin  on 

Huge congratulations to everyone involved with a Top Ten winner this year! 

In a rare feat--Leddy Maytum Stacy got two!

5
Director of Sustainable Design
LMN Architects
LEEDuser Basic Member
4 thumbs up
Fri Apr 20, 2018, 7:24 pm