EBOM-v4 EAp2:Minimum energy performanceposted by Ivan Blazevic on
Can a project (with adeqaute proportion of lab area) located in the United Kingdom benchmark its performance against Lab21 tool data?
Strategy A - 2500 cd/m2
NC-v4 EQc6:Interior lightingposted by Filipe Boni on
I`m trying to understand the Option 2 -Strategy A and having difficulty of finding this illuminance on brazilian cutsheets. Is this information that I need to look at?
Patient Rooms
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Eric Brossy de Dios on
IEQ 8.2 calls for "A minimum of 90% of the inpatient units" to be within 20' of a perimeter that provides an unobstructed 11 degree (or more) view of exterior glazing.
Glass Roof Above Stairwell
NC-v4 SSc5:Heat island reductionposted by Lucas Ozols-Mongeau on
We are currently designing a new construction project that will have a glass roof above a stairwell shaft.
Total project users as a daily average
NC-2009 PIf3:Occupant and Usage Dataposted by Dave Hubka on
Project Information form #3 version 06 requires the project team to list the 'total project users as a daily average'.
Does anyone know which credit this links to?
Drywall replaced on int. non-structural wall
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Marisa Britton on
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?
opaque building envelope construction
NC-v4 EAp2:Minimum energy performanceposted by Ahmed El-Semary on
i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??
Group approach
posted by Subramaniam Chandrasekaran on
we are looking into one campus with four buildings plus a food court; intend to register under CS; there is one virtual boundary for the whole campus; all four buildings are coming up together; sin
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer