Forum quick links
Registration for LEED Homes multiple buildings
posted by Mugdha Mokashi on
Hi,
IAQ testing in a new addition
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Shawn Keith on
We are have chosen to perform IAQ testing on a new additon, to a we are building.
5 materials versus 5 material waste streams
NC-v4 MRp1:Storage and collection of recyclablesposted by Susan Walter on
Page 479 in the RG states that you need to identify 'at least five materials...targeted for diversion.' On page 481 in Step 3, the 5th step says that you need to 'specify the means and methods of d
Material Description vs Material Type in the Calculator
NC-v4 MRc5:Construction and demolition waste managementposted by Agnieszka Rylska on
There are two separate columns in New Construction and Demolition Waste Management Calculator in .xls format: ‘Material Description’ and ‘Material Type’.
Maintenance Garage Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Keith Lane on
I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.
single occupant offices as designated smoking rooms?
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Christian Bösselmann on
In a multi tenant CS office building smoking is prohibited in the entire building (Option 1). However the owner wishes to execute a few single person offices as designated smoking rooms.
Charging Station Location
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by on
This project is a small Inn that has a small parking lot onsite and a larger parking lot outside of the project boundary.
CI V4- Innovation: Green Vehicles
CI-v4 INc1:Innovationposted by Oliver Bate on
My project has 30% of carparking reserved for electric vehicles. The plugs used comply with an IEC standard but not the one specfied in the credit requirements.
Information on 10 years canopy
CS-v4 SSc5:Heat island reductionposted by Marianne Vajstedt on
Do you know where information can be found to determine the daimeter of trees after 10 years of planting? Our landscaping architect have only the information in maturity.
Baseline LPD for a Vehicle Driving Test ground
NC-2009 EAp2:Minimum Energy Performanceposted by Aru Sau on
There is Car Driving Test Ground located outside the building, which takes power from the substation inside the building. This ground is closely resemblance of a space like car racing (i.e.