Retail -Clarifying Reference Guide language indicating "14 days"

Retail-CI-v4 EQc4:Indoor air quality assessment
posted by  Stacey Olson  on 

The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.

0

Using Default Roof Material SRI values

NC-v4 SSc5:Heat island reduction
posted by  Lauren Sparandara  on 

Hello - I noticed that there are default SRI values available for use for the ground SRI values through CIR #10411 - just as was done for LEED 2009 - are there some default values that can be

3
Thu Dec 14, 2017, 5:25 pm
1
Fri Dec 15, 2017, 8:08 pm

NC-v4 MR

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Lissa Spitz  on 

Can anyone clarify the following section from p469 of the ref guide?  It seems to be saying only include MEP materials that are credit compliant in calculations.

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Dec 14, 2017, 3:23 pm

enhance indoor air quality strategies

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  SAJJAD MALIK  on 

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

 

1
Mon Jan 15, 2018, 8:51 pm

Submetering requeriments for exclusive chiller for tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Maria Isabel Conde  on 

The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area.

1
Fri Dec 15, 2017, 3:21 pm

SDS for CASRN

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Ralph Bicknese  on 

What type of feedback are people receiving from reviewers if trying to use the options to provide "A publicly available inventory of all ingredients identified by name and Chemical Abstract Service

0

Entryway systems excluded

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Jorge Lopez de Obeso  on 

Hello everyone, My project is a naturally ventilated office space that does not have any entrance close to the exterior; therefore, according to the Reference Guide, our project is excluded from t

3
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Dec 13, 2017, 9:19 pm

Roller Window Shades

NC-v4 EQc2:Low emitting materials
posted by  Christine Chow  on 

Are interior installed roller window shades included in the credit requirements?

1
Wed Dec 13, 2017, 8:15 pm

Industrial park can be considered as the previously developed site?

Warehouses-NC-v4 LTc4:Surrounding density and diverse uses
posted by  Vang Le Luong  on 

A new project in the industrial park, which was altered by agriculture use, can be achieved Option 1 of LTc4?

Thanks alot for your respond

1
Tue Nov 2, 2021, 12:09 pm