Durable chairs for large meeting space
posted by Alex Wilson on
I'm advising a nonprofit organization (the Retreat Farm) on whose board I sit that is renovating a large, 8,000 sf, 19th Century barn into a large community meeting space and wedding venue.
Electricity with Demand Flexibility
Pilot-Credits EApc152:GridOptimal Building ACPposted by Cory Duggin on
What is the best way to determein any electricity with demand flexibility? What should I input in the form if it is 0? If I enter 0 it acts like all fields haven't been filled out, so I
Academic Survey on EPDs
posted by Daniel Stine on
I was asked to share this with my network...
Electric Tower Crane - kWh for usage
posted by Laura Soma on
I'm looking to compare using an electric tower crane vs a diesel generated tower crane. I've got the average gallons/hour for the size of crane I'm looking at, but when I reached out to the c
CDWM - Recycling Facility Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Preethi Sreeraj on
It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast
On-Site waste-to-energy technology for existing stadiums/arenas/venues.
posted by Sagar Desai on
Hello,
Guidance for approaching outdoor swimming pools for a municipal project
posted by Edward Reifenstein on
We are designing a community center and aquatics facility with several outdoor pools.
Location of outside airflow measuring station inside the HVAC unit
NC-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine