EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Mario Kranzl  on 

"Prohibit on-property smoking within 25 feet of ENTRIES, outdoor air intakes and operable windows." I didn't found a definition, which entries are meant?

3
Fri Mar 22, 2013, 5:51 pm

Steel

Schools-2009 MRc5:Regional Materials
posted by  Jose Martinez  on 

For steel products, would the extraction location be the mill where it is produced?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 22, 2013, 4:21 pm

Elevated Air Speed

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  Natalie Terrill  on 

Anybody else having a problem with elevated air speed (over 40 fpm)? I have a commerical office building with ceiling diffusers with 60 fpm and the credit has been audited for elevated air speed.

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Mar 22, 2013, 3:53 pm

USGBC Overhauls Demand Response Pilot - in Response to Critics

Pilot-Credits EApc8:Demand response
posted by  Tristan Roberts  on 

My colleague Nadav Malin has been investigating this credit and just wrote up the following about it, which he emailed to me:

16
Manager, LEED
USGBC
LEEDuser Premium Member
26 thumbs up
Fri Mar 22, 2013, 3:10 pm

WEp1- Kitchen Sink for Cafeteria

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sharon Chen  on 

I am working on a LEED CI project. It’s an office building with kitchen sinks in pantry areas throughout the building, which is available for all the occupants.

4
Fri Mar 22, 2013, 1:40 pm

Smoking areas

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  charles bell  on 

We prohibit smoking in our office buildings, but have a central plaza which will provide designated smoking area. Question: does that designated smoking area need to be covered? Thanks!!

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 22, 2013, 12:54 pm

One single treatment plant for two LEED projects

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Michael E. Edmonds-Bauer  on 

We have a project in which site two independent buildings will apply for LEED certification.

3
Fri Mar 22, 2013, 6:33 am

Weighted calculation - lower SRI value

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  LEED Pro Consultant  on 

Hello! We have a project in which the client will install a roofing material with an SRI value of 70 (low slope: requirement-78) for 100% of the roof area. Can this be compliant with this credit, u

3
Fri Mar 22, 2013, 4:43 am

Incorporating LEED interpretation to SSc5.1

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Phil Meyer  on 

Hi all, I have a question regarding a recent LEED interpretation citing SSc5.1.

3
Fri Mar 22, 2013, 4:40 am

Shower/Changing Room not Required?

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Marci Schreiber  on 

Our CS project has 66 FTEs. When I completed the SSc4.2 template on-line it automatically populated the "number of showers required" as "0". Can that be correct?