Forum quick links
campus energy - pieces of the pie
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
On our campus AG projects, We have a central plant providing energy for 6 buildings. Only three of the buildings are LEED projects.
ESC plan language
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aldo Pazo on
Hello everybody. Can we submitt in LEED Online our ESC Plan in other language different than English? for example in Spanish? Thank you!
Option 1 - Projects with Internal Streets
ND-v2009 NPDp3:Connected and open communityposted by Michael Smithing on
Our project is a mixed use office/retail/park development with only one internal street crossing the site. In determining whether to apply Option 1 or Option 2 to our project, it appears that the
Some questions on LEED volume program
posted by Grace Ming on
I need some advice on the LEED volume certification program.
Simpson Diversity Index score
ND-v2009 NPDc4:Mixed-income diverse communitiesposted by Scott Preston on
Elliot, After running this calcualtion our score is 0.597318339. Do we round this up to 0.6 as is the case in many other LEED calculations?
HVAC Equipment Installation prior to Roof
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Maggie Pipek on
The contractor would like to install the HVAC equipment although the roof is not on the building yet.
Construction impact zone for infill
ND-v4 GIBc7:Minimized site disturbanceposted by Colin Day on
Hi Eliot, If a project is an infill, has been previously graded and already contains streets, would it meet the requirements of this credit? Also, if no historic trees existed in this (an old hay
Australian equivalent of fuel-efficient vehicles
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mary Haw on
Our project is based in Australia and is targeting certification under both LEED and the local rating system, Green Star.
Anchor Tenant wants sole access to showers
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by SmithGroup BG+LU FW on
We’ve got a core and shell commercial office building in construction, under 300,000 square feet, using CS-2009.
Mixed species
CS-2009 WEc1:Water Efficient Landscapingposted by Mike D on
Do the different species of plants need to be listed individually on the form or does 'Mixed' suffice? The green roof consists of a mix of trees, shrubs, and flowers. Thanks!