Forum quick links
VAV box serving multiple space types
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Mike Fortier on
One of my project's multi-zone systems has a single VAV box serving multiple space types (corridor, storage, office). What is the best way to approach this scenario in the 62MZ calculator?
Network Area
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Greengrade User on
In LEED 2009 does it include a bicycle network plan as part of the credit?
Wood/Metal Shop
Schools-2009 IEQc7.1:Thermal comfort - designposted by Dan Forino on
Has anyone been able to achieve this credit in a ventilated, but not conditioned Wood/Metal shop.
Homers energy efficiency in Central America
ND-v2009 GIBc2:Building energy efficiencyposted by Jose Ng on
Hi leeduser team: For countries with tropical climate without certification systems of energy efficiency (for homes).
Stripper/Cleaner for Paint preparation - under "Other?"
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Heather DeGrella on
I am helping a manufacturer of a zero-voc Concrete Cleaner/Stripper that is used for preparing concrete for painting figure out how the product fits into LEED.
Signatory Statement and Signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Daniel Garavito on
We are currently working in a project located in New York City. The owner owns the entire floor where the project is located.
Documenting salvaged items
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by American University on
What kind of documentation is required for salvaged materials? I'm thinking specifically in a campus setting where we are salvaging furniture from other buildings for use in the project building.
Initial Inventory
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by American University on
Can someone explain the building inventory? I see here it says to inventory for manufacturer, etc but the LEED online form just asks for a number of mercury-containing bulbs in the building.
kitchen sub-meter
EBOM-2009 WEc1:Water performance measurementposted by Jaida Anderson-Lozano on
Our project if a large office building with approximately 1200 employees. We have a whole building water meter and a domestic hot water meter. If we add a meter into the commercial kitchen.
Can
NC-2009 PIf1:Minimum Program Requirementsposted by Qiang Zhang on
I have a critical issue about the LEED v4 boundary, i have attached several images for your reference. To discuss with the developer, we are going to certify the 1 2 3 4 as a whole building, 1 is