Forum quick links
Simultaneously encouraging and frustrating...
posted by Brian Salazar on
Tristan - Nice article and review of the LEED "Feedback Plaque" as some folks are calling it. You asked for our feedback on the plaque itself as well and I have to admit that I'm conflicted.
Ventilation Effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
Measuring for an Office Building with 92 Heat Pumps
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alan Grant on
My client has an office building with one outside air supply fan supplying ventilation air throughout the three story building via ductwork to 92 heat pump units.
An unusual situation with Recycling Tickets
NC-2009 MRc2:Construction Waste Managementposted by Christine Castellano on
As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met
Fire Department Practice Burn
NC-2009 MRc2:Construction Waste Managementposted by Brian Leet on
We have a project on a large campus which has involved demolition of over a dozen buildings.
DES Option 2 - Clarification
NC-2009 EAc1:Optimize Energy Performanceposted by FABIO VIERO on
Hi, we are working on a LEED NC 2009 project consisting of an office building, where the thermal energy (heating via hot water) is generated and distributed by means of a municipal grid (about 40 m
PU foam
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Emmanuel Pauwels on
Under what category would a 1-compnent mounting Polyurethane foam fall and consequently what would be the maximum VOC level allowed?
No autosizing of equipment on proposed?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Is there a reason why the equipment on the proposed can not be autosized?
Exhaust Fan Testing in a Laboratory
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alexis Thompson on
I am working on a laboratory project and we are gearing up to perform the exhaust fan testing internally.
What's in return?
posted by Wing Ho on
As far as I know, the cost of $6000 a year is kind of like annual subscription fees for the LDP. After 12 months, you’ve to return the LDP back to USGBC in good shape.