Preferred parking on surface lot or in garage structure

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Deborah Lucking  on 

First of all, thanks to all for the lively discussion on LI 10202 (April through Sep 2013).

1
Fri Nov 27, 2015, 4:44 am

Questions about High-rise residential LEED Energy Modeling

NC-2009 EAc1:Optimize Energy Performance
posted by  Tommy Xing  on 

Hi I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.

0

Coating on process equipment applied onsite

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  LEED Pro Consultant  on 

Hello all, I am working on an industrial manufacturing building where a piece of the process equipment will be painted onsite as part of the installation requirements, but as it is part of the eq

1
Thu Jul 2, 2015, 3:28 am

Exterior space, partially enclosed - Application of Std.

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Mauricio Ramirez  on 

Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.

1
Mon Jul 6, 2015, 10:20 pm

Legacy LEED AP's

General forums
posted by  Patty Lloyd  on 

Do legacy LEED AP's need to take the LEED GA exam if they wanted to re-test to become a specialized LEED AP?

1
Thu Jul 2, 2015, 6:54 pm

Envelop Commissioning

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Doo  on 

The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts

1
Thu Mar 3, 2016, 9:36 am

Building Type

NC-2009 EAc2:On-Site Renewable Energy
posted by  Geraldine Assmus  on 

I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit.

1
Fri Jul 3, 2015, 3:10 pm

Base building system

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Graham Langton  on 

Hi, To what extent does the base building system need to be entered into the VRP calculator?My CI project spaces is carried out space by space but that level of detail for other tenants isn't ava

0

Pick up and Drop Facility

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Priyadarsi Das  on 

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.

0

SSc4.3: "publicly posted at the entrance of the parking area"

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Greengrade User  on 

Our project is a classroom and faculty office building with an occupancy calculated at 89 FTE and 707 peak transients located on an urban college campus .

1
Fri Nov 27, 2015, 4:37 am