Forum quick links
LEED Interpretations
NC-2009 IDc1:Innovation in designposted by Henrique Mendes on
I´m not sure if this is the right fórum. But seemed like the most appropriate. My question is: Is it possible to ask for a LEED interpretation without having a project registered in LEED Online?
Calculating Green Power
NC-2009 EAc6:Green powerposted by Marina Horchin on
I want to figure out the default number to use to calculate how much green power in RECs a building would need to purchase. The RG that I have states 11.7 kWh/SF-yr for Office.
Calculation of drawdown rate Qr
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Therese Malm on
How is design storm interval determined? I looked into the LEED BD+C Reference Guide on page 97 in the example (last calculation) at the top of the page.
LEED NC Retail Table 1-4 Process Efficiency Measures
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
I am working on LEED ratail project for EAp2 option 1.
Efficienty of permanent hose irrigation
NC-2009 WEc1:Water efficient landscapingposted by Marcio Alberto Casado Pereira on
We've posted this question here a few times before but no response... Does anyone know which efficiency should we consider for landscape that will be irrigated manually, by hose?
LEED-CI renovate 3 floors, entire building has same owner
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Michelle Halle Stern on
The commentary above seems contradictory to me.
Question about what to include in systems narrative
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Magda Aghababyan on
Our project only have ventilation, cooling and lighting system from the systems mentioned in the credit description.
Case for existing parking
ND-v2009 NPDc5:Reduced parking footprintposted by Tommy Linstroth on
Our project is a gut rehab of existing attached townhomes with offstreet surface parking. There will be no new offstreet parking. The only non-residential building is a community center.
Guidance on proper way to caluclate domestic hot water usage
NC-2009 EAp2:Minimum energy performanceposted by Matt Scott on
Forgive my ignorance, but I am not familiar with plumbing design. I need to calculate the domestic hot water usage as part of the energy model in EAp2.