Our project only have ventilation, cooling and lighting system from the systems mentioned in the credit description. We have included them and also we added boiler as another system in the systems narrative.

Apart from the above the facility has some machines and I don't see them as a system to include in the narrative. So do you think having ventilation, cooling, lighting and boiler will suffice for systems narrative?