3rd Party Independent Reviewer as Enhanced CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Lesley Treacy  on 

Hi, I have read through the comments and understand the requirements for the Enhanced Commissioner to be a 'disinterested' or 'independent' body.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 27, 2012, 2:15 pm

onsite waste water treatment plant

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Razan Nejem  on 

if our building is part of a bigger development which has a central waste water treatment plant does this count as being an onsite plant and will it count towards option 2.reducing 50% of building

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 27, 2012, 2:07 pm

Excluding Soil Brought in from Off-site

NC-2009 MRc4:Recycled Content
posted by  Margaret McColl  on 

Hello, I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site.

11
Tue Nov 27, 2012, 1:34 pm

"In Site" basic services - the case of a Shopping Center

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Ricardo Sá  on 

I am working in the LEED certification of a Shopping Centre (Core & Shell) where the following stores will be installed: Bank, Beauty Salon, Laundry, Library, Pharmacy, Post-Office, Restaurant,

8
Tue Nov 27, 2012, 10:28 am

Pre Occupancy Filter Replacement for a Tenant

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Laura Charlier  on 

Is a CI project required to replace the filters of the main building AHU? The project is a 5000 sf office space tenant in a 162,000 sf building (no AHU's in the space).

2
Mon Nov 26, 2012, 10:25 pm

RP spreadsheet has same credit listed twice.

EBOM-2009 RPc1:Regional Priority
posted by  Peter Doo  on 

The RP credits for the project zip-code shows the same credit reference listed for RP 5 and RP 6. Does this mean that we get 2 RP points if we achieve the double listed credit?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 26, 2012, 10:14 pm

LEED v2009 Minimum energy savings %

NC-2009 EAc1:Optimize Energy Performance
posted by  Thomas Hellmann  on 

Option 1 compliance path indicates the minimum % savings is 10% for new construction. In the LEED v4 comments a mention was made that the threshold was 12% for v2009.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 26, 2012, 9:56 pm
8
Default Avatar
DOWA-IBI Group Architects
LEEDuser Basic Member
12 thumbs up
Mon Nov 26, 2012, 9:08 pm

Reactive Penetrating Sealers

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Shane Tohara  on 

On a CI 2009 project we have slab on grade that was initially poured without a water vapor barrier causing moisture issues in the entire sturcture.We would like to polish the concrete and add Reac

4
Mon Nov 26, 2012, 7:47 pm

Semi-conditioned spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the definition of "semi-conditioned" spaces.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 26, 2012, 7:13 pm