Credit Calculations

Pilot-Credits PC19: Whole Building Reuse
posted by Christine Robbins-Elrod on Oct 3, 2011, 12:28 pm

Hi, I'd like to verify if I have documented this Pilot Credit correctly?
-I have included exterior windows in the building envelope calculations since the team is preserving all existing...

Counting surfaces

Pilot-Credits PC19: Whole Building Reuse
posted by Bradley Guy on Aug 15, 2011, 12:33 pm

Hello Heather,
Your comments are just the kind of feedback this pilot process is intended to elicit. We need to figure out this ratio of non-structural and structural / envelope surfaces...

Last reply: Heather Walters, Aug 15, 2011, 1:16 pm

Major problem with the credit, in my opinion

Pilot-Credits PC19: Whole Building Reuse
posted by Heather Walters on Aug 15, 2011, 7:37 am

As I see it the major issue with this credit is the 75% threshold in MR 1.1 &1.3.

Consider two possible assemblies.
- A 1920s 18" thick historic masonry and terracotta...

Window Replacement

Pilot-Credits PC19: Whole Building Reuse
posted by Patrick Castelvecchi on Aug 11, 2011, 3:47 pm

One thing to consider by requiring project teams to include windows in the calculation is areas where the exisitng windows cannot physically be retrofitted to meet the new performance criteria....

Last reply: Sarah Buffaloe, Aug 12, 2011, 4:18 pm

75% Whole Building Reuse

Pilot-Credits PC19: Whole Building Reuse
posted by Bradley Guy on Aug 1, 2011, 5:19 pm

Hello Heather,
To answer your questions -
1. Yes that is correct this is the total of structural and non-structural assemblies and components as defined by each in MRc 1.1 and 1.3....

Questions on 75%?

Pilot-Credits PC19: Whole Building Reuse
posted by Heather Walters on Jun 9, 2011, 8:26 am

We are finishing up documenation on a building which is on the National Register, went through review, recieved approval from the state, and earned historic tax credits.

I just found...

"Blight" designation

Pilot-Credits PC19: Whole Building Reuse
posted by Kath Williams on Apr 25, 2011, 12:44 pm

The building we are reusing for a project is considered as "contributing" to the historic neighborhood. In addition, the neighborhood has been designated as a "blight" area for the purpose of...

Last reply: Christina Macken, May 3, 2011, 3:52 pm

Very Historic Building Project

Pilot-Credits PC19: Whole Building Reuse
posted by Richard Reed on Apr 29, 2011, 3:50 am

It was very interesting to find this credit source. We are going after platinum status for the renovation of the abandoned Guam Legislature. We are knocking ourselves out to get Exemplary...

Last reply: Christina Macken, May 3, 2011, 3:49 pm

Whole Building Reuse New Credit

Pilot-Credits PC19: Whole Building Reuse
posted by Bradley Guy on Dec 6, 2010, 10:10 pm

We hope the consideration of cultural and social aspects of reusing existing buildings through this credit is a valuable addition to the LEED standards. Your inputs are welcome in the development...

Last reply: Bradley Guy, Apr 19, 2011, 5:09 pm