Outdoor Water Use credit - LEED V4.1
NC-v4.1 WEp1:Outdoor Water Use Reductionposted by Maria Farah on
In LEED BD+C: New Construction V4.1, the outdoor water use reduction credit (2 points) states that alternative water sources can be used to achieve an additional 30% reduction.
Extensive Green Roof Habitat Area
NC-v4.1 SSc2:Protect or Restore Habitatposted by Summer Minchew on
LEED Addenda #10231 (https://www.usgbc.org/leedaddenda/10231) effectively stated that extensive roof systems could not count towards SSc5.1 Site Development-Protect or Restore Habitat for v3 -
LEED Campus Project with Mixed-Use Buildings – Do Villas Fall Under LEED for Homes?
posted by Alefiya Bhiwandiwala on
I’ve registered a LEED project under the campus approach, which includes a hotel, residential apartment buildings, and a few standalone villas.
Mrc2: option2 Environmentally preferable products
Homes-v4 MRc2:Environmentally preferable productsposted by Faisal on
We’re planning to pursue LEED v4 Homes MRc2 credit under Option 2, specifically in the insulation category for ≥25% postconsumer recycled content.
Surface area or just cost?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Diego Prada on
Hello everyone,
IPpc90 Social Equity within the Project Team - Option 1
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Atlas Turner on
Greetings All,
Overseas PM2.5 Non-Attainment Areas
NC-v4 EQp1:Minimum indoor air quality performanceposted by Timothy Ian Middleton on
Our project is in what would be considered a PM2.5 Non-attainment area if it were in the USA (according to ASHRAE 62.1 table I-1) because it is just above the 12µg/m3 annual average.
Points relative to Appliance and Process Water
NC-v4 WEc2:Indoor water use reductionposted by Francesco Passerini on
As project team, we are involved in a NC project.
Burj Khalifa - PLATINUM in 2024 with huge media facade?
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Marine Petrosyan on
Hi, All!
I am a bit confused and would appreciate the support of the community in one question.
PPA of PV on building roof with partial RECs
NC-v4 EAc2:Optimize energy performanceposted by Salomee Hinque on
Hi all,
Solar panels will be installed on the roof of the building to be certified though a Power Purchase Agreement.