Forum quick links
Recycled content counted as a regional material
NC-2009 MRc5:Regional materialsposted by Sara Heppe on
I am getting conflicting information about the allowable extraction/harvesting point for recycled content in materials.
Treating CUP as a DES?
posted by Irina Foster on
Hi, I am working on a LEED Healthcare project. The hospital building is phase 1 of a number of phases within a large master plan area.
Commissioning Walk-in Freezers / Coolers
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Richard Woodward on
We have a mixed use new office / commercial kitchen project with owner occupiers.
Calculating Vot in Credit Template
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Rick Servoss on
The Template calculates Vot by dividing Voz by Ev. ASHRAE 62.1 2007 arrives at Vot by dividing Vou by Ev, not Voz.
M&V Plan - Specific Acceptable Range(s) of Error
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Marina Andrade on
Hello, I just got the review comment requesting the “specific acceptable range(s) of error”, follow the comment bellow. “TECHNICAL ADVICE: Please revise the Measurement and Verification Plan, as
Design and Build Contract
posted by Ameet AA on
I am working on multiple building campus level projects which fall under same contract and same owner.
Audits Around the World
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by Jenny Carney on
All, I'm trying to compile a list of energy audit providers outside of the US.
Air cooled chillers and other air cooled equipment.
NC-2009 EAp2:Minimum energy performanceposted by Rudolph Carneiro on
Question: If I have an air cooled chiller selected at non-ARI conditions that has a full load efficiency of 3.0 COP, does it comply with the minimum efficiency requirement of 2.8 COP from ASHRAE -