IAQ Management Program

EBOM-v4 EQc9:Integrated pest management
posted by  Josue Diaz  on 

The reference guide states that an IAQ management Program has to be in place and include a series of item listed under "Step 2".  In order to document this credit a copy of such has to be uplo

1
Tue Sep 17, 2019, 1:08 pm

Is installing more than one water meter per subsystem ok?

NC-v4 WEc4:Water metering
posted by  Pablo Muñoz  on 

The credit is not specific enough (as it is in the energy metering credit).

1
Tue Sep 17, 2019, 6:21 pm

Option 2 - zone floor area calculation

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Edgar Arevalo  on 

When the LEED handbook instructs to calculate the zone floor area by multiplying the bay width with the bay depth to core, is the "bay depth to core" considered the distance from the wall (or windo

0

Option 4 for the Whole Building Life Cycle Assessment for 3 Credits using ATHENA.

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  RICHARD ABRAHAMS  on 

Option 4 requires calculating impacts for both the Baseline Building and the Proposed Building in the following 6 categories:

0

Carbon Dioxide

Sustainable MEP Leaders
posted by  Luke Leung  on 

Received answers from below questions from NIST Andy Persily

1. Is there a preferred bookends range of CO2 for both “optimal” energy and human performances?

Andy: No

4
Vice President
SmithGroup
LEEDuser Premium Member
0 thumbs up
Mon Sep 16, 2019, 7:26 pm
1
Mon Sep 16, 2019, 5:29 pm
3
President
C-Wise Design and Consulting
LEEDuser Premium Member
70 thumbs up
Mon Sep 16, 2019, 2:38 pm

SSc2 Option 1 - parking garages

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Faith Wilbert  on 

Do I include parking garages as part of the density calculations?

2
Mon Sep 16, 2019, 1:43 pm

stork parking

NC-v4 LTc8:Green vehicles
posted by  Francesco Passerini  on 

The Reference guide states: "Preferred parking spaces have the shortest walking distance to the main entrance of the project, exclusive of spaces
designated for people with disabilities".

0
2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon Sep 16, 2019, 12:44 pm