Forum quick links
Hotel Resort - multiple blocks as a "single building"
Hospitality-NC-v4 MPR3:Must comply with project size requirementsposted by A&L SUSTENTABILIDADE on
Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc.
Opening an Anticipated credit
posted by Victoria Rios Esteve on
Hi! We are working on a LEED v2009 Core and Shell certification. We are about to upload Construction Submittal's documentation.
Light Pollution Site Plan
CS-v4 SSc6:Light pollution reductionposted by Shea Gonzalez on
I understand I need to show all my exterior lighting in the site plan for documentation but what if i have exterior balcony lighting at multiple levels and rooftop lighting , how to I represent mul
WWR allowances
NC-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Problem in skipping review
posted by Mario S. on
Hello.
Skip Construction Final Review with Pending credit
posted by Aparna Pradeep Kumar on
We just received the Preliminary Construction Review Report from LEED and are happy to accept the results of the preliminary review as final.
Cool Walls material equivalent tables
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Mariana Guevara on
Sometimes a material data sheet does not have SR and or TR. Is there a material standard that can be used as refrence to obtain the SR and TE values?
Air Curtains in ASHRAE/IES Standard 90.1-2019
NC-v4 EAp2:Minimum energy performanceposted by Nima Soltani on
Recent ASHRAE/IES Standard 90.1-2019 Updates include the possibility of installing an air curtain system instead of installing a Vestibule / Revolving Door Entrance.
LEED Interpretation 10498
CS-v4 EAp2:Minimum energy performanceposted by Apoorva Pradhan on
Hello-
I wanted to get some clarity on LEED Interpretation 10498- https://www.usgbc.org/leedaddenda/10498