Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can we talk about Plumbing Fixtures?

Sustainable MEP Leaders
posted by  Sarah Gudeman  on 

Nothing exciting like embodied carbon or EPDs... but I'm interested in some real talk on the actual performance of low-flow fixtures.  

4
Principal | Practice Lead
BranchPattern
LEEDuser Premium Member
6 thumbs up
Thu Feb 18, 2021, 2:07 pm

AEC BBB Letter update + action items

Green Commons
posted by  Clark Brockman  on 

Greetings AEC Sustainability Leaders -

1
Thu Feb 18, 2021, 6:52 pm

VOC content for wet applied adhesive

NC-v4 EQc2:Low emitting materials
posted by  Muhammad Mahasneh  on 

Hello,

we are evaluating an onsite wet-applied adhesive that has report of VOC content measured in accordance to ISO 11890-2.

1
Fri Feb 26, 2021, 5:56 pm
0

Legal Wood ACP for LEED O+M

Pilot-Credits MRpc102:Legal Wood
posted by  Joshua Chia  on 

Has anyone tried to attempt this pilot credit for LEED O+M: Existing Buildings? Am targeting this credit for Green Cleaning Products that are PEFC certified.

0

Solar Panels

NC-2009 EAc2:On-Site Renewable Energy
posted by  Paula Hernandez  on 

Hello, I am working on a Project that wants to claim all the available points on EA-c2.

7
Tue Feb 16, 2021, 10:09 pm

Building as a teaching tool

NC-v4.1 INc1:Innovation
posted by  Jon Penndorf  on 

For a building that is not a K-12 school, can we still pursue the credit for Building as a Teaching Tool using the old credit interpretation? Summarized below. 

2
Tue Feb 16, 2021, 7:40 pm

how to classify our site?

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Aynaz Alaei  on 

Hi,

Does open grass area that was previously re-graded (decades ago) to slope to a man made stormwater retention pond count as greenfield, or is this previously disturbed?

0

Entryway systems

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  K Pomperada  on 

Our project is an office building already being occupied by tenants, and the entryway system measures only 9 ft. lacking 1ft from the requirement by LEED.

0