Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Option 2 - Strategy H

NC-v4 EQc6:Interior lighting
posted by  Kaitlin Beeman  on 

Hello,

I have a few regularly occupied lab spaces with suspended lights at around 12'-8".  There is no ceiling in the space and the structure goes up to around 20'-0". 

0
4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 27, 2018, 2:29 pm

Thermal Break or lact there of... is there a way to detect the impact via modeling?

Green Commons
posted by  Seonhee Kim  on 

I'm sure may are familiar with Aqua in Chicago, and Joe Lstiburek's article on thermal bridging.

8
Jacobs Buildings & Infrastructure
LEEDuser Premium Member
140 thumbs up
Fri Apr 27, 2018, 12:31 pm

Thermal energy storage for district cooling

NC-2009 EAc1:Optimize Energy Performance
posted by  Nuttanee Vongveeranonchai  on 

I am modelling a project receiving chilled water from the district cooling plant with an ice storage and wondering how to account for energy use shifting in the building model if I use Option 2 Ful

1
Fri May 4, 2018, 2:34 pm

components or assemblies?

CI-v4 EQc2:Low emitting materials
posted by  Len Sciarra  on 

Within Option 1, In the product category “walls, ceilings, & acoustical insulation” we are supposed to meet the General Emissions Criteria or CDPH Standard Method v1.1–2010.

3
Director of Sustainability
Living Building Consultancy
LEEDuser Basic Member
6 thumbs up
Fri Apr 27, 2018, 10:52 am

VOC Testing: Air Quality Sciences testing compliant with CDPH SM v1.1-2010?

CI-v4 EQc2:Low emitting materials
posted by  Kena David   on 

We are currently verifying that an insulation product would meet the Low Emitting Materials criteria.

2
Default Avatar
Berkeley Analytical (BkA)
LEEDuser Basic Member
2 thumbs up
Fri Apr 27, 2018, 10:43 am
6
Fri Apr 27, 2018, 5:28 am

Commercial office refurbishment: which rating system?

LEED Rating System Selection
posted by  Ricardo Sá  on 

One of our clients is starting a major refurbishment of an office building. Main characteristics of this operation are:

 

0

Off-Site Parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jeannie Rueter  on 

I'm working on a major remodel for a city-owned conference center that has no on-site parking. There is a city-owned parking garage near by. The conference center has 25 employees.

10
Thu Apr 26, 2018, 8:21 pm

Service water heating for process water usage

NC-2009 EAc1:Optimize Energy Performance
posted by  Kris Phillips  on 

I have a commercial kitchen facility that has a number of plumbing fixtures used for pot filling, etc, which are considered process water (and is reflected as such in the Water Use Reduction c

1
Thu Apr 26, 2018, 8:09 pm