Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Monthly ETO rates

NC-v4 WEp1:Outdoor water use reduction
posted by  Nate Maniktala  on 

Has anyone recently accesed IWMI for ETO rates? It used to be very straightforward but now the site has changed and the database doesnt seem to be accesible anymore to produce monthly ETO.

7
Principal
Ecovert Corporation
LEEDuser Premium Member
43 thumbs up
Tue Jan 10, 2023, 6:09 pm

Estimating Energy Performance Scores before registering a project

EBOM-v4.1 EAp3:Energy Performance
posted by  Bob Snow  on 

I am trying to estimate the current performance of a building but it appears the only way to see what the GHG Emissions Score, Source Energy Score, and Energy Performance Score is to fill out

1
Tue Sep 26, 2023, 11:46 am

Light Pollution Reduction

EBOM-v4 SSc4:Light pollution reduction
posted by  AMIR ZULKHAIRI AHMAD BANGI  on 

Hi All, can anyone explain the meaning of "the lamps are adequately shielded" in the Light Pollution Reduction Criteria?

1
Tue Jan 10, 2023, 9:20 pm

Regarding Embodied Carbon/LCA Optimization

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Nagaraj Sankar  on 

In this credit, How can I prove that my  purchased material has compile with Embodied Carbon/LCA Action Plan or other impact reductions .

1
Sun Jan 8, 2023, 6:02 pm

SDL Winter Summit Registration is now open! (Jan 23-25, Tempe, AZ)

SD Leaders
posted by  Nadav Malin  on 

Gather with the Changemakers in Sustainable Design

7
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri Jan 6, 2023, 9:47 pm

Virtual DES Energy Rates

NC-v4 EAp2:Minimum energy performance
posted by  Todd Tewksbury  on 

When modeling district cooling and heating systems using Option 1, Path 1: ASHRAE 90.1-2010 Appendix G, the LEED Reference Guide instructs the following: "If tariffs or rates are not available from

7
Principal
ME Engineers
LEEDuser Premium Member
29 thumbs up
Fri Jan 6, 2023, 3:23 pm

Slab / Floor Insulation, is it mandotary

Homes-v4 EAp1:Minimum energy performance
posted by  Omar Elrawy  on 

Hi,

For the prerequisite requirement to add R-19 insulation to floor / slab under energystar, is it required on every floor?
Knowing that all floors are airconditioned,

1
Sun May 14, 2023, 6:15 pm

Using v4.1 Credit Substitution, Thresholds tab reflecting v4 requirements

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Darrah Jakab  on 

My project is registered as v4 and is using the v4.1 credit substitution for Low-Emitting Materials.

1
Tue Jan 10, 2023, 7:58 pm

If all products in one category comply with the VOC emissions evaluation do we need to list the cost or surface area?

NC-v4 EQc2:Low emitting materials
posted by  Summer Gorder  on 

We are having a tough time getting the costs from our subs. The subs says that the cost is bundled with other material and they can't break it up.

2
Thu Jan 5, 2023, 7:21 pm

Correct process to certify multi-use building that contains offices and data center?

LEED Rating System Selection
posted by  Moshe Muller  on 

What is the correct registration process for certifiation in a building that will contain a data center underground and above ground will serve as office space 

1
Thu Jan 12, 2023, 12:33 am