District Energy System owned by Government vs. Owner

NC-2009 EAc3:Enhanced Commissioning
posted by  Erin Holdenried  on 

My question is in regard to both EAc3: Enhanced Commissioning and EAc5: Measurement and Verification credits in relation to a District Energy System.

3
Fri Apr 1, 2016, 6:31 am

single zone or multi-zone calculation?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Hongyun Zhou  on 

I have a project, which have two types of system: 1. OA system offering the fresh air to each room, and each room has an individual fan coil unit . 2.

2
Fri Apr 1, 2016, 1:41 am

Design for Active Participants

Pilot-Credits EQpc78:Design for active occupants
posted by  Robert Fiala  on 

We found this pilot credit after our school project was designed and beginning construction.

2
Thu Mar 31, 2016, 5:01 pm

LEED EBOM EAP2 Minimum Energy Effiuciency

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  ABDUL MUTHALIB MOHAMED  on 

Hi, We are pursuing Option 2B: Energy Baseline including Historical Data for minimum energy efficiency, the weather normalized Energy Use Index from Energy Star Portfolio Manager during performance

3
Thu Mar 31, 2016, 4:15 pm

HPD - predicted by process chemistry

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Suzanne Drake  on 

"Predicted by process chemistry" is indicated on the HPD I am reviewing. Is this acceptable in any way toward the Building Product Disclosure credit?

3
sustainability director
Revel
LEEDuser Basic Member
0 thumbs up
Thu Mar 31, 2016, 3:45 pm

MOB - Recycling Calculations

Healthcare-v2009 MRp1:Storage and collection of recyclables
posted by  Lauren Bellamy  on 

I am working on this credit for a new MOB. I have looked online without any success on a baseline for the projected volume of recyclables.

5
Sustainability Leader and Architect
AECOM
LEEDuser Premium Member
9 thumbs up
Thu Mar 31, 2016, 12:51 pm

Option 1 - HPD Residual Disclosure

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Dalton Ho  on 

Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”.

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Mar 30, 2016, 7:55 pm

Raised flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Florinda Garcia   on 

does the raised floor must meet the floorscore requirements?

2
Wed Mar 30, 2016, 4:56 pm

In-Unit Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I've received a comment from the LEED reviewer after they denied my approach in calculating the LPD for the proposed building (dwelling units).

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Mar 30, 2016, 3:21 pm

Using historic data

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Omar Delgado  on 

What are the requirements to comply with this prerequisite if using historic data? How much (percentage) lower than the historic average must my current EUI be?

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Wed Mar 30, 2016, 3:04 pm