Additional Points for Water Reuse
NC-v4 WEc2:Indoor water use reductionposted by Soo Choi on
I am working on a project that has a vehicle wash bay where they intend to recycle the water and use it multiple times for washing before discharging to sewer.
Base Case vs Project Case
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?
EBOMv4 - Streamlined Path option
EBOM-v4 MPR1:Must be in a permanent location on existing landposted by Catalyst Partners on
EBOMv2009 had a streamlined path option for projects that had previously achieved BD+Cv2009 Certification. Does that still exist for EBOMv4?
voc for Damp proofing paints under ground
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by soha yamani on
Hi all , do damp proofing paints that are used to paint concrete foundations, retaining walls, and column necks are considered inside the building ?
Refrigerant Atmospheric Impact
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
Good Morning, I am currently working on this credit and something in the guide (page 301) does not make much sense to me... At the top of the page in Table 3 it has the calculation for the RAI as
bike sharing programs
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by cathy keagle on
Can a bike sharing program be instituted at a facility that would satisfy or supplement this credit
Regularily Occupied or not?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Alex Barrera on
I'm working on an industrial building in Virginia. One of the rooms is a Quiet/Sleep room, where employees can rest in between their shifts.
commissioning tests
Healthcare-v2009 EAp1:Fundamental commissioning of building energy systemsposted by SAUL HERNANDEZ on
where can i find the tests of every system to be c commissioned?
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
Commercial Refrigeration Systems
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on