Forum quick links
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Outdoor Air Delivery Monitoring - Installation of CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by SAMY Chamy on
1. CO2 sensors are installed in our project, but not interconnected with fresh air fans. CO2 sensors will only monitor the CO2 levels and raise an alert when the levels are increased.
EPD's for architectural woodwork
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paul Setzer on
Hello- As I read the v4 MR requirement for EPD's, they apply to assembled products.
n/a
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.5 states: Ventilation.
IPM in Place and No Pesticides Used
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Ryan Hoffman on
We are working on a recertification. The vendor says they have not applied any pesticides during the performance period.
Default Occupancy for a Health Club
posted by Paula Hernandez on
Hello everyone, We are currently working on a C&S office building, that has also some retail space and a health club space in one floor.
leed ebom- v4: Enhanced indoor air quality strategies
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by VISHESH AGARWAL on
Option 2. Additional enhanced IAQ strategies (1 point) Comply with the requirements of at least one of the following. 1. Filtration for mechanically ventilated spaces 2. Carbon Dioxide Monitors 3.
VENTILATION WAREHOUSES
Warehouses-EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Helena Garcia on
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. The question is for the warehouse, this warehouse is not conditioned and the spa
Energy Modeling using "HAP"
NC-2009 EAp2:Minimum Energy Performanceposted by Muzamil Rafique on
Hi Marcus Sheffer, i am totally confused please guide me.
APPA auditors
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Pablo Fortunato Suarez on
The project is going for re-certification and in the previous certification, this credit was awarded. My client is again opting for a third party auditor.