Forum quick links
Tenant Sub-Metering
CI-2009 EAc3:Measurement and Verificationposted by Donald Green on
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.
multi occupant spaces for outpatient
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by andres ramirez on
HI, Multi occupant patients spaces (eg. waiting rooms for outpatients) should be listed on the shared multioccupant spaces IEQc6.1-3 or on patient areas Table IEQ6.1-2.? thanks
Views for Ballroom (Conference Center)
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Qiongwen Kong on
We have a project that consists of a 17-story and a large conference center on lower levers.
Gender Split?
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Garrett Ferguson on
I haven't been able to find any info on this, but what I've heard doesn't quite make sense to me.
No Mow Grass
Schools-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cynthia Kaplan on
My Massachusetts school project is restoring a large area and considering No Mow grass. Will this be considered as a monoculture like turf grass, or a meadow?
Annual Equivalent Full Load Hours of DHW Operation
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, In relation to Table 1.4 where can one get "Annual Equivalent Full Load Hours of DHW Operation". Is this something I need to calculate or is it a standard value ?
Light fixtures count?
CI-2009 MRc3.1:Materials Reuseposted by Lorenna Lobo on
Does light fixtures and lamps count for this credit?
"Special Conditions" for baseline
NC-2009 WEc1:Water Efficient Landscapingposted by Ralph Bicknese on
For our current project, virtually 100% of landscaping is turfgrass using 62.5% efficient rotors, usually a difficult combination for achieving 50% reduction.
Energy Modeling for Support buildings
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Recently we submit the factory building to LEED as Individual project certification not for group certification.
Onsite honey production
Pilot-Credits SSpc82:Local food productionposted by Elodie DUMAS on
Hello , We attempted to submit onsite honey production as innovation. The reviewer oriented us to that credit.