Topic | Recent |
---|---|
Document UploadNC-v4 EQc6: Interior lightingposted by Boggarm Setty on Aug 4, 2015, 10:40 am
For V4, is there no requirement anymore to upload supporting documents? Last reply: Charalampos Giannikopoulos, Aug 4, 2015, 10:43 am |
|
Option 2 DocumentationNC-v4 EQc6: Interior lightingposted by Charalampos Giannikopoulos on Jun 30, 2015, 7:35 am
When it comes to option 2 it is request to describe the method for determining reflectance values. Would a prescriptive descriptive apporach be accepted i.e. based on colour selection? For... Last reply: Charalampos Giannikopoulos, Jul 14, 2015, 4:26 am |
|
Lighting control in office spaceNC-v4 EQc6: Interior lightingposted by Jeroen Sap on Dec 8, 2014, 10:52 am
I am working on an office building that has overhead lighting that is controlled based on occupancy sensors. The fixtures are grouped per 3,6 meters and there is no manual override. Additionally... Last reply: Lauren Sparandara, Dec 10, 2014, 4:46 pm |
|
1 point or 2?NC-v4 EQc6: Interior lightingposted by Michelle Oishi on Jul 24, 2014, 5:26 pm
The description of the credit seems to provide two options each worth 1 point but links them with an "OR". Is the intent that the lighting can earn 2 points by doing both option 1 and option 2... Last reply: Tristan Roberts, Jul 24, 2014, 11:39 pm |