Forum quick links
Exemplary performance for SSc2 in LEED v.2
NC-2009 SSc2:Development Density and Community Connectivityposted by Whysal Haddad on
I have a project with a Project Development Density = 298,419 Sf/acre and after the calculations the Average Neighborhood Development Density = 249,458 Sf/acres. I want to pursue the exemplary perf
Defining performance goals and seeking an example initiative
Pilot-Credits EApc59:Occupant engagementposted by Samantha Harrell on
Regarding this requirement: "Track and document the results of the occupant engagement initiative(s) against the established performance goals and identify areas for improvement." Which performance
Is a borrow pit considered "previously developed" land?
ND-v2009 SLLp5:Floodplain avoidanceposted by Jason Franken on
Our project includes a large location that was disturbed and altered for use as a borrow pit during the construction of a nearby interstate highway.
calculating peak visitors for a multi-unit residential building
ND-v4 SLLc4:Bicycle facilitiesposted by josee boutin on
LEED 2009, would consider 10% of dwelling units or 4 (refer to SLLc4 equation 2) bicycle storage for visitors. LEED v4 requires short-term bicycle storage for at least 2.5% peak visitors.
Off-hours control, zone isolation
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
According to ASHRAE 90.1 (section 6.4.3.3.4), all HVAC systems serving zones that are intended to operate or be occupied non simultaneously, shall be divided into isolation areas and equipped with
Off-hours control, automatic shutdown
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
According to ASHRAE 90.1 (section 6.4.3.3.1), all HVAC systems shall be equipped with a control systems that turns the HVAC off on a time basis (timeclock control) or when the spaces are not in use
Using LEEDv4 Fundamental and Enhanced ECx to achieve ID LEED2009
NC-2009 IDc1:Innovation in Designposted by Candice Rogers on
Hello, This question has 2 parts. 1). Our project would like to submit LEEDV4 Fundamental and Enhanced Cx for Envelope only as ID points in a project registered for LEED 2009.
Warehouse Semiheated or Heated?
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
I am running into a conundrum for a CS warehouse that will have no HVAC systems installed upon completion of the CS project. The only energy savings to document are for the envelope and lights.
Anti-Corrosive Paint
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Pablo Carcamán on
I need to know if an anti-corrosive paint it's applicable to this credit and if it is, In what category should I rate this product? What is the rule that sets the VOC's limit content?
Fuel types of process energy
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have a new plant using NGV as a fuel to fry potato chip in Thailand.