Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Industrial zone
NC-v4 LTc3:High priority siteposted by Charalampos Giannikopoulos on
Would an officially designated industrial zone which provides tax incentives to businesses be considered as an eligible "high-priority site" to locate a project on? Thank you.
preliminary design review - chiller - Baseline
posted by jana Paulech on
Hi, I would like you to ask for helping me with one LEED issue. We were doing energy model and we have received comments to our model, which one of them is this one: 8.
Minimum energy performance calculator
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Hi everybody I'm working on file "Minimum Energy Performance Calculator" for EAp2 (last version available in Resource on leedonline) which is unlocked. I need to fill in a new system or componen
LEED Dynamic Plaque- Anyone using it for EBOM recertification?
posted by Kimberlee Dobbins on
I know of one building attempting to use LDP for EBOM recertification. Has anyone successfully achieved recertification and willing to share the experience?
Scrap as regional material
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by FABIO VIERO on
Hi everyone. Could a scrap of a production process be claimed as regional material, assuming that it is generated and harvested in the same plant (which is, of course less the 160 km from project s
Energy performance vs. Energy Cost
Mid-Rise-v4 EAc1:Annual energy useposted by Eesmyal Santos-Brault on
Hi - It seems that this version of the rating system is targeting energy performance improvement over energy cost budget. Is that right?
Cx for LEED V4
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Anton Paley on
Great flowchart on Cx for V3. Got one for V4?