Single confirmed Tenant - is a binding lease agreement required?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Alexis Voeltner on
Our client is building a cold dark shell specifically for a tenant (Large grocery store) and the tenant has specified all HVAC, plumbing fixtures, IAQ requirements...
Stadium / Arena
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Stacey Olson on
I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.
CCHP System modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Jie Shen on
My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers.
CREC purchase
CI-2009 EAc4:Green Powerposted by Harpreet Rooprai on
I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.
RCI CORR Information
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by John Danby on
I have found that it takes a bit of work to actually see that a facility has achieved the Recycling Certification Institute's CORR certification.
The envelope data for old building (baseline) are not avaiable
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Hi, I am modeling campus building under major renovation. But since that building was built in 1968, no envelope data available (no spec.
SSC 4.2- Bicycle rack
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Giuseppina Amorusi on
Hi all, I need an information about the location of the bicycle rack. I’m working on a Core&shell shopping center, less than 300,000 square feet. The shopping center has more entrances at diff
CCHP Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Jie Shen on
Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat reco
Paired bus route service
NC-v4 LTc5:Access to quality transitposted by Patrice McVeigh on
Hi, Is it necessary for both stops to be within 400m of the site in order to satisfy the paired route requirements?
MRP3- minimum square meter for group certification
Hospitality-NC-v4 MPR3:Must comply with project size requirementsposted by Giuseppina Amorusi on
Hi all We are developing a pre-assessment to evaluate the certification level under LEED v4 for a campus. In the campus we have small buildings of about 80 square meters each (hospitality rooms), a