Forum quick links
mixed use
posted by FABIO VIERO on
Hi all, we are working on a refurbishment project located outside US and we are looking for applying LEED v4. The four stories building consist in a mix use as follows: • Museum: more than 75% GFA
How do we show for compliance for non-occupiable spaces?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Logan Dorrell on
I'm a little confused by what we are supposed to show to document compliance for non-occupiable spaces, like restrooms, that the space matrix call out as "N (VRP) / Y (other req's). We have filled
Calculating Ds for cooling condition
NC-2009 IEQp1:Minimum IAQ Performanceposted by William Beechinor on
Hello, I am trying to determine whether or not I am calculating Ds correctly.
is a BMS necessary?
NC-2009 EAc5:Measurement and Verificationposted by Alfonzo Collins on
The building we’re for which considering M&V will have 14 submetered apartments (which includes the condensing unit for each), as well as a house meter, for electricity (gas will be on one main
Material reuse calculation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jen Roberts on
The second example on pg 536 of the reference guide is a bit confusing.
Water Use Reduction Calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.
Aquifer for cooling
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Erik Nordlund on
I have a project where the project team are planning to partly cool the building using an aquifer.
VOC Meters
posted by Johanna Hendricks on
Has anyone purchased a meter for the annual VOC testing? If so, can you tell me the make/model information and if it worked well? Thanks for any help!
EQ PC 57 - French feedback
CS-2009 IDc1:Innovation in Designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning EQ PC 57 use, for an office tower project in France (Marseille) under LEED CS V3. For this project, LEED CS V3 and French "HQE" (High Env
Withered grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.