Demolished Building - Material Reuse
NC-2009 MRc3:Materials Reuseposted by Lauren Bellamy on
Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.
Time after Performance Period- EBOM 2009
posted by Ana Carolina Montecinos Ongini on
I am a little confuse about how many days we have to submit the project after performance period ends. Is it 60 or 90 days? Thanks in advance
IEQc8.1 Core and Shell credit with no tenant fit out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shelly Christman on
We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.
Is touch-up paint exempt?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Erin Holdenried on
This LEED Interpretation states that touch-up paint consists of small unanticipated quantities that can't be controlled by specifications, and therefore is exempt from the credit.
LEED NC v2009: Innovation Design
NC-2009 MRc2:Construction Waste Managementposted by Paola Medina on
Batteries from other company could be encapsulated with concrete in the fund elevators instead of send to landfills?
Credit compliance using AVR as an alternative metric
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Zane Lichtneger on
I see some formal programs use “average vehicle ridership” (AVR) as an alternate metric. We are active participants with the Go Smart/Go Perks/Triangle Transit/Share The Ride program.
Leed boundary for commercial interior
CI-2009 PIf1:Minimum Program Requirementsposted by Elena Gonzi on
Hi, I have some question about LEED Commercial Interior certification : 1) Situation: we have a offices building that has a basement in common with other two offices buildings.
Recycling Batteries
NC-2009 MRc2:Construction Waste Managementposted by Paola Medina on
One of our environmental companies have a lot of batteries that they want to recycle in our LEED project instead of send to landfills through encapsulate with concrete in the background hole of ele
Mandatory requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
LOCAL PLASTER COMPLIANCE PRODUCT
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by MARIA FERNANDA CORREA MENDIVELSO on
HI... How is the way for document compliance for a local product made with plaster and Shintech PVC Resin wich is used before apply final paint. Thanks